Wednesday, November 28, 2007

Testing and Data = engineers party


First test went off without a hitch.
Here are pics... they do better than words

I'll upload photos of the Data and a detailed description of what is going on.


the control station
Motor in the center of the blast walls. These are 2 sheets of 1/2" plywood with 2" of space between... to be filled with sand.
upper box is the data box and the lower box is the relay controler
relay controler on the left, Data in the center with battery and a pressure transducer on the right.


A bad photo of the new setup.
Thrust Curves







No comments: